Project Response Pty Ltd  
Project Respons, Australia  
  

scroll down for more


 

List of Completed Projects


Project Response - completed projects

YEAR 96 — 04   Channel 7- Epping Sydney—HAL Edit Desks, Avid Edit Desks, Digital Stills Des , Studio Lighting Desk, Tech Man Desk, Audio Control Desk, Graphics Camera Stands, numerous 45RU Equipment Racks (own design), Autocue desks, Production Tapes Console. Their latest seven E.N.G. trucks racking and wiring.
Extensive installation/cabling projects since 1996.

99 - 00   Channel 7 Sydney Olympics Venue - 2 complete Production Control Rooms inc. mon banks and Audio Controls, 2 Network Pres Control rooms , complete MCR Desk and CTA racks, Tape storage shelving, Graphics Desks and Camera Stand, Autocue desks and numerous ancillary items.

99   SOBO Sydney Olympics — Edit Desk

99 — 00   SOCOG Sydney Olympics Broadcast Facility - 4 I.B.C. Control Desks X 11 bays each, 9 Complete " Production " Control rooms (excl. Mon. Banks), 10 Audio Control rooms, Videotape Transfers Desk, approx 13 Graphics desks with upstands and numerous rack and control ancillaries.

96—00   Edit Houses — Numerous desks throughout Sydney, a large number for B.T.S. - Graeme Paech and other individuals.

01 — 03   Seven Network Main Broadcast Centre ( DOCKLANDS )
Master Control Desk - circular in 20 bays with suspended circular 25 bay mon bank, Complete News Control and Audio Control with mon. banks, 4 complete On Air Pres Suites, 9 edit suites, 3 Announce booths, Ingest Desks, Production Studio Control Desk, T.D's Desk and main monitor bank, 3 V.O. Booths plus other sundry desks.

02   SKY SPORT —Refitting of small O.B. Truck - racking, console and wiring.

Start—02   Sydney Backup Centre for Docklands — Full Pres. Desk and mon. bank plus 2 Ingest Desks.

Mid—03  Seven - Sydney - High Def. Production Studio — Complete production studio = production desk, T.D's desk, main monitor bank, complete audio control + racks.

Mid—03   Seven Network - Perth/Adelaide/Brisbane — 4 Non Linear Edits + 5Bay Ingest Desk per state.

Start—04   Seven - Sydney - Martin Place News Centre —10 Non Linear Desks , 40 x 45RU racks , Krone mount frames, Audio Post Desk, V.O. Booth, High Def. Desk, 20 Bays of Ingest/Archive Consoles

Mid—04   S.B.S. - Sydney — 7 Non Linear Edit Desks , Audio Post Control Desk

Start—05   SEVEN - PERTH —Edit Desk

Mid—05   SEVEN - Melbourne Docklands— Two Edits

Late—05     Sky News Sydney — Various ControlRoom Monitor Banks

Mid—06   

Seven - Sydney Martin Place—  Disaster Recovery Centre

A.B.C. - Sydney Ultimo — Production StudioControl main monitor bank


Late—06   T.V.S.N. - Sydney — Two complete Production Control Rooms, Presentation Control Room. Two Edit Suites, One Audio Control Room

Start—07 

T.V.S.N. — Finish above complex

Seven — Melbourne Docklands — Five bay Ingest Console

Mid—07 

Seven's - Adelaide - Studios — Two production studio desk tops, High Density Krone mounting rack.

Seven - Sydney Martin Place — Production Control– 2

Jones Bay — Audio Control Desk

Late—07

Penrith C.L.C. - Studio Production Desk

Sydney S.B.S. - Audio Production Desk

Start—08

XYZ Channel relocation - Production Console, Presentation Console, Ingest Desk and 2 Edit Desks

End—08

A.B.C. - Production Console + Audio Mixer Console

 

Home | Photos of Projects, start page 1 | contact Project Response


 

State of the Art